Switchgear manufacturing

Our high-qualified workers from departments
    Clients and service center, 
    Orders and logistic center and,
    Engineering
are always at your responce concerning the realisation of your projects from consulting, planning and project management up to the Factory Acceptance Test (FAT)

The production of our modern INDUSTRIAL-SWITCHGEAR-SYSTEMS is maintained through the flexible structural technological manufacturing process in our profit centers
    Switchgear manufacturing und 
    Sheet metal forming center
as well as permanent controlling of projects budget.

Due to it we are able to realise more big and small projects of the highest quality (from mechanical to electrical assembling parallel) on our modern area of production and preparation over 10000 m2.


The routine test at a site is one of the most important instrument for quality control.

Generally each switchgear undergoes the routine test before the delivery:
    Revision of switchgear combinations, e.g. wiring,
    Compliance with the documentation,
    Optional electrical functional test,
    Isolation test,
    Control of safety measures and revision of the passing protective conductor
       connections








© Copyright 2011 FEAG Sangerhausen GmbH. All rights reserved.