as well as permanent controlling of projects budget.
Due to it we are able to realise more big and small projects of the highest quality (from mechanical to electrical assembling parallel) on our modern area of production and preparation over 10000 m
2.
The routine test at a site is one of the most important instrument for quality control.
Generally each switchgear undergoes the routine test before the delivery:
Revision of switchgear combinations, e.g. wiring,
Compliance with the documentation,
Optional electrical functional test,
Isolation test,
Control of safety measures and revision of the passing protective conductor
connections